Information Page

MTHL: India’s Longest Sea Bridge Bridging Gaps and Unlocking Opportunities

*Representation Purpose

Mumbai Trans Harbour Link: Connecting Mumbai and Navi Mumbai

Introduction: The Mumbai Trans Harbour Link (MTHL) is a transformative infrastructure project that aims to connect Mumbai and Navi Mumbai through a 21.8 km access-controlled sea bridge. With a construction history dating back to the 1990s, the MTHL has finally gained momentum and is progressing towards completion. This article provides essential information about the project’s status, key details, and the involvement of various contractors and stakeholders. As one of India’s longest sea links, the MTHL holds great promise for enhancing connectivity and fostering regional development.

  1. Progress and Key Facts: The MTHL, currently under construction, stretches from Sewri in Mumbai to Chirle in Navi Mumbai, Maharashtra. The foundation stone was laid by Prime Minister Narendra Modi in December 2016, and work commenced in April 2018 for three civil packages. Once completed by Larsen and Toubro (L&T), Tata Projects, and other contractors, the MTHL will become India’s longest bridge/sea link, spanning a length of 18.187 km. The project’s estimated cost is approximately Rs. 17,843 crore, with 85% of the financing provided by the Japan International Cooperation Agency (JICA).
  2. Project Packages and Contractors: The MTHL project has been divided into three civil packages and one system package.
    1. Larsen and Toubro – IHI Corporation JV are responsible for Package 1, covering the section from Sewri up to marker 10.38 km.
    2. Daewoo E&C – Tata Projects Limited JV are undertaking Package 2, which spans from marker 10.38 km to step 18.187 km.
    3. Larsen and Toubro are also handling Package 3, comprising the stretch from 18.187 km to NH-4B at Chirle. T
    4. he Intelligent Transport Systems (ITS) package, including toll and transport management systems, is being executed by STRABAG – EFKON India JV.

These experienced contractors ensure the smooth implementation of the project, adhering to engineering, procurement, and construction (EPC) guidelines.

  1. Connecting the Islands and Beyond: The MTHL will bridge the geographical gap between Mumbai and Navi Mumbai, linking the two bustling cities and reducing travel time significantly. This strategic connection will not only enhance accessibility for commuters but also facilitate seamless movement of goods, fostering trade and economic growth. Moreover, the bridge will provide a crucial link between Mumbai, Pune, and Raigad district, opening up new avenues for business expansion, tourism, and overall regional development.
  2. Stakeholders and Contractors: The MTHL project involves multiple stakeholders, including the Maharashtra State Road Development Corporation (MSRDC) and Mumbai Metropolitan Region Development Authority (MMRDA) as the implementing agency, various government departments, engineers, architects, and renowned contractors. Leading global and domestic infrastructure firms have been appointed for different packages of the project, bringing their expertise to ensure the construction of a world-class sea bridge. This collaborative effort reflects the commitment to delivering a landmark infrastructure that will transform the region.
  3. Employment Generation and Economic Impact: The construction and operation of the MTHL will create a significant number of employment opportunities, benefiting the local workforce. The project will require skilled labor, engineers, technicians, and support staff, generating a positive economic impact on the region. Additionally, the improved connectivity and accessibility provided by the bridge will attract businesses and industries to set up operations in Navi Mumbai, Pune, and Raigad district, leading to job creation and increased revenue generation.
  4. Enhanced Connectivity and Tourism: The MTHL’s completion will revolutionize travel and transportation in the region. Commuters will experience reduced travel time, improved traffic flow, and seamless connectivity between Mumbai, Navi Mumbai, Pune, and Raigad district. This enhanced connectivity will not only benefit daily commuters but also boost tourism, attracting visitors to explore the diverse attractions in and around Mumbai. The bridge will unlock the potential of the region, making it more accessible and enticing for both domestic and international tourists.

Conclusion:

The Mumbai Trans Harbour Link (MTHL) is a significant milestone in the infrastructure development of Mumbai and Navi Mumbai. With its strategic alignment and impressive length, the bridge will enhance connectivity, reduce travel time, and stimulate economic growth in the region. The involvement of reputed contractors and the financial support of the Japan International Cooperation Agency (JICA) underlines the importance and commitment to this project. As the MTHL nears completion, it paves the way for a brighter future, unlocking opportunities for trade, employment, and regional development. This ambitious sea bridge signifies the progress and transformation underway in Mumbai’s infrastructure landscape.

Review : MTHL: India’s Longest Sea Bridge Bridging Gaps and Unlocking Opportunities
5/5
Blog Review :
5/5

One Response

Recent Posts..